Coating

Cleaning, cutting, coating and shipping in about 4 weeks. read more

Titanium Bundle

Replacing steal coated bundles with Titanium bundles. read more

Transport

How we cleanly transport our products and make sure they are clean on arrival. read more

Projects

With serious damage it could be necessary to do repairs or even retubing.

Bundle with Titanium pipe

The twelve meter long bundle in this example is rebuild with Titanium tubes before it is placed back into the hull.

Transport

Condenser is taped up and is ready for transport to the coating factory. Taping up the condenser protects the tubeplates, which are cleaned for a second time when they arrive at the coating factory.

Coated heater (LNG, LPG, NH3 installation)

By attacked tubes and tubeplates on the seawater side, leakages occurred in this heater bundle. The bundle was built up from steal coated tubes and steal coated tubeplates and is replaced with a bundle with Titanium tubes and with Titanium cladded tubeplates.

Example Projects

Coating

After cleaning and cutting of the sharp edges the tubeplate and the inside of the tubes are provided with several layers of coating. The coating process is carried out by Zaremba Germany. The coating process takes approximately 4 weeks to complete, this includes transport.

top of the page

http://siekmansir.com/en/projects.html#widget0

top of the page

http://siekmansir.com/en/projects.html#widget0

top of the page

http://siekmansir.com/en/projects.html#widget0

top of the page

http://siekmansir.com/en/projects.html#widget0
http://siekmansir.com/en/projects.html#widget3
http://siekmansir.com/en/projects.html#widget4
http://siekmansir.com/en/projects.html#widget1